{"id":6383,"date":"2022-07-05T15:46:47","date_gmt":"2022-07-05T13:46:47","guid":{"rendered":"https:\/\/uman.eu\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/"},"modified":"2025-11-21T16:07:56","modified_gmt":"2025-11-21T15:07:56","slug":"liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower","status":"publish","type":"realisations","link":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/","title":{"rendered":"Li\u00e8ge University Hospital \u2013 &#8220;Winner of the competition for the construction of a new tower&#8221;"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Construction of a new building at the Li\u00e8ge University Hospital on the Sart Tilman site, covering more than 40,000 m\u00b2.<\/p>\n\n<p class=\"wp-block-paragraph\">Tower 7 is located in a decentralized area of the CHU site. It is surrounded by parking areas to the north and west and by the existing logistics quay to the south. It can only be connected to the existing buildings on the side of Tower 2 to the east. The site\u2019s level differences, the beautiful distant views of the surrounding forest, and the building orientation are assets to be highlighted for Tower 7.  <\/p>\n\n<p class=\"wp-block-paragraph\">At level -1 are the Emergency Departments, with private and ambulance arrivals separated.<\/p>\n\n<p class=\"wp-block-paragraph\">At level 0, the focus is on connecting Tower 7 to its immediate surroundings: the existing ground-level parking to the north will be replaced by P112\/P116, and a future tree-lined park, connected via a pedestrian path, will highlight the main entrance of Tower 7.<\/p>\n\n<p class=\"wp-block-paragraph\">The natural slope of the site allows patients and visitors to enjoy a landscaped park and a directly accessible drop-off area near the entrance hall of Tower 7.<\/p>\n\n<p class=\"wp-block-paragraph\">This significant visual connection with the park (and the green roof at level 0) enhances the well-being of level 0 visitors, patients, and staff on the upper floors (intensive care, delivery suite, maternity, gynecology consultations, offices, and meeting rooms).<\/p>\n\n<p class=\"wp-block-paragraph\">Vehicular access will be designed to integrate into the park while meeting the accessibility standards for emergency vehicles (access to the main fa\u00e7ade of Tower 7).<\/p>\n\n<p class=\"wp-block-paragraph\">The various functions like day hospital, intensive care, maternity, neonatology, gynecology, and CASCO are distributed across the five upper floors, which are connected by a central temperate atrium. <\/p>\n\n<p class=\"wp-block-paragraph\">On the roof, there is a \u201cHeliport\u201d area, an aluminum platform intended for medical helicopters.<\/p>\n\n<p class=\"wp-block-paragraph\">The project study is also structured around four sustainability pillars: energy, comfort, water, and materials.<\/p>\n\n<p class=\"wp-block-paragraph\">n association with VK and Bureau d\u2019Etudes Pierre Berger.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction of a new building at the Li\u00e8ge University Hospital on the Sart Tilman site, covering more than 40,000 m\u00b2. Tower 7 is located in a decentralized area of the CHU site. It is surrounded by parking areas to the north and west and by the existing logistics quay to the south. It can only [&hellip;]<\/p>\n","protected":false},"featured_media":4864,"menu_order":21,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":""},"realisations_category":[102],"realisations_tag":[],"class_list":["post-6383","realisations","type-realisations","status-publish","has-post-thumbnail","hentry","realisations_category-health"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Li\u00e8ge University Hospital \u2013 &quot;Winner of the competition for the construction of a new tower&quot; - UMAN architect s.a.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Li\u00e8ge University Hospital \u2013 &quot;Winner of the competition for the construction of a new tower&quot; - UMAN architect s.a.\" \/>\n<meta property=\"og:description\" content=\"Construction of a new building at the Li\u00e8ge University Hospital on the Sart Tilman site, covering more than 40,000 m\u00b2. Tower 7 is located in a decentralized area of the CHU site. It is surrounded by parking areas to the north and west and by the existing logistics quay to the south. It can only [&hellip;]\" \/>\n<meta property=\"og:site_name\" content=\"UMAN architect s.a.\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/umanarchitectes\/\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-21T15:07:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1281\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/\",\"url\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/\",\"name\":\"Li\u00e8ge University Hospital \u2013 \\\"Winner of the competition for the construction of a new tower\\\" - UMAN architect s.a.\",\"isPartOf\":{\"@id\":\"https:\/\/uman.eu\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg\",\"datePublished\":\"2022-07-05T13:46:47+00:00\",\"dateModified\":\"2025-11-21T15:07:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage\",\"url\":\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg\",\"contentUrl\":\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg\",\"width\":1281,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/uman.eu\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Realisations\",\"item\":\"https:\/\/uman.eu\/en\/realisations\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Li\u00e8ge University Hospital \u2013 &#8220;Winner of the competition for the construction of a new tower&#8221;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/uman.eu\/en\/#website\",\"url\":\"https:\/\/uman.eu\/en\/\",\"name\":\"UMAN architect s.a.\",\"description\":\"Architecture that puts humans first\",\"publisher\":{\"@id\":\"https:\/\/uman.eu\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/uman.eu\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/uman.eu\/en\/#organization\",\"name\":\"UMAN architect\",\"url\":\"https:\/\/uman.eu\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/uman.eu\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/06\/uman-logo-baseline-dark-jungle.png\",\"contentUrl\":\"https:\/\/uman.eu\/wp-content\/uploads\/2022\/06\/uman-logo-baseline-dark-jungle.png\",\"width\":1000,\"height\":358,\"caption\":\"UMAN architect\"},\"image\":{\"@id\":\"https:\/\/uman.eu\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/umanarchitectes\/\",\"https:\/\/www.linkedin.com\/company\/u-man-architectes\",\"https:\/\/www.instagram.com\/umanarchitectes\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Li\u00e8ge University Hospital \u2013 \"Winner of the competition for the construction of a new tower\" - UMAN architect s.a.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/","og_locale":"en_US","og_type":"article","og_title":"Li\u00e8ge University Hospital \u2013 \"Winner of the competition for the construction of a new tower\" - UMAN architect s.a.","og_description":"Construction of a new building at the Li\u00e8ge University Hospital on the Sart Tilman site, covering more than 40,000 m\u00b2. Tower 7 is located in a decentralized area of the CHU site. It is surrounded by parking areas to the north and west and by the existing logistics quay to the south. It can only [&hellip;]","og_site_name":"UMAN architect s.a.","article_publisher":"https:\/\/www.facebook.com\/umanarchitectes\/","article_modified_time":"2025-11-21T15:07:56+00:00","og_image":[{"width":1281,"height":720,"url":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/","url":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/","name":"Li\u00e8ge University Hospital \u2013 \"Winner of the competition for the construction of a new tower\" - UMAN architect s.a.","isPartOf":{"@id":"https:\/\/uman.eu\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage"},"image":{"@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage"},"thumbnailUrl":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg","datePublished":"2022-07-05T13:46:47+00:00","dateModified":"2025-11-21T15:07:56+00:00","breadcrumb":{"@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#primaryimage","url":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg","contentUrl":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/07\/CHU-2-Avant-jour.jpg","width":1281,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/uman.eu\/en\/realisations\/liege-university-hospital-winner-of-the-competition-for-the-construction-of-a-new-tower\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/uman.eu\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Realisations","item":"https:\/\/uman.eu\/en\/realisations\/"},{"@type":"ListItem","position":3,"name":"Li\u00e8ge University Hospital \u2013 &#8220;Winner of the competition for the construction of a new tower&#8221;"}]},{"@type":"WebSite","@id":"https:\/\/uman.eu\/en\/#website","url":"https:\/\/uman.eu\/en\/","name":"UMAN architect s.a.","description":"Architecture that puts humans first","publisher":{"@id":"https:\/\/uman.eu\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/uman.eu\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/uman.eu\/en\/#organization","name":"UMAN architect","url":"https:\/\/uman.eu\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/uman.eu\/en\/#\/schema\/logo\/image\/","url":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/06\/uman-logo-baseline-dark-jungle.png","contentUrl":"https:\/\/uman.eu\/wp-content\/uploads\/2022\/06\/uman-logo-baseline-dark-jungle.png","width":1000,"height":358,"caption":"UMAN architect"},"image":{"@id":"https:\/\/uman.eu\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/umanarchitectes\/","https:\/\/www.linkedin.com\/company\/u-man-architectes","https:\/\/www.instagram.com\/umanarchitectes\/"]}]}},"_links":{"self":[{"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/realisations\/6383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/realisations"}],"about":[{"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/types\/realisations"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/media\/4864"}],"wp:attachment":[{"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/media?parent=6383"}],"wp:term":[{"taxonomy":"realisations_category","embeddable":true,"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/realisations_category?post=6383"},{"taxonomy":"realisations_tag","embeddable":true,"href":"https:\/\/uman.eu\/en\/wp-json\/wp\/v2\/realisations_tag?post=6383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}